Hello,Welcome to ZhangJiaGang XinMeiYuan Machinery Co。,Ltd!

中文版 | English

PRODUCT

CONTACT

Contact:Miss.Fan
Mob:18962292345
Contact:Mr.Qin
Mob:13913291715   
Contact:Mr.Pan  
Mob:13451501545
Tel:0512-58600009
Fax:0512-58600009
E-mail:xmy@zichenyip.com
Add:Zhangjiagang City Leyu town old State Road 204

NEWS

Bottled pour installed performance / bottled water production line works

Author: ComeFrom: Date:2015/12/30 14:05:33 Hits:698
Big bucket of water filling production line | new US source bottled water filling equipment works
QGF-450 barrel / large bucket of water filling production line | new US source bottling equipment used automatic control PLC programmable logic controller, which works as follows:
1, the automatic pull cover
QGF big bucket of water filling production line | US sources after new bottle filling equipment conveyor drive, after pulling the cover detection switch detects the bottle, pull the front cover barrier bottle cap pulling lift cylinder cylinder moves down bottle after pulling the cap blocking cylinder clamping cylinder moves, the cylinder before resetting barrier bottle while pulling the lid lift cylinder rise, blowing bottle caps blown out of the machine outlet, cover barrier bottle after pulling cylinders reset, thus pulling the cover of a cycle is completed.
2, automatic external brush barrel
QGF type 4500 barrels / large bucket of water filling production line | After Bottled water bottle filling equipment transmission chain drive, brush barrel when the detection switch detects a bottle, the bottle brush with former resistance cylinder operation when the second detected After the bottle, push the bottle brush bucket cylinder, bottle brush bucket cylinder blocking action, while blocking bottle brush bucket cylinder before resetting, brush barrel drive motor brush barrel pump starts running simultaneously on the outer wall of the bottle washing, cleaning after a set time is reached, the brush Push the reset while the cylinder barrel bottle brush bucket drive motor and brush barrel pump stops, then brush cylinder barrel barrier bottle reset, bringing a brush barrel cycle.
3, automatic bottle
QGF-450 barrels / h large bucket of water filling production line | bottle drive chain runs on bottled water filling device, when the bottle position detection switch detects a bottle, the bottle hit the cylinder moves the bottle hit after hit supreme bottle holder bottle cylinder reset cylinder moves the bottle into the bottle holder bottle of imported bottles, bottle drive motor after running on the bottle cylinder reset, bringing a bottle cycle.
4, Washing
QGF-450 barrels / H large bucket of water filling production line | Bottled water bottle filling equipment imported into the bottle after bottle holders, followed by washing through nine stations, the first station and the second station are made of two chlorine monoxide (CIO2 solution) washing disinfection, the third station of medicine drip dry wash station; fourth station and a fifth station to a net wash ozone disinfection station, the sixth station to disinfect drip dry washing station ; seventh and eighth station stations as pure water station, the ninth station of pure wash station drain. Wash the bottle after bottle drive motor is transmitted to the location off the bottle, thus a washing cycle is complete.
5. Filling
QGF-450 barrels / H large bucket of water filling production line | Bottled Water Filling Equipment Filling part of the three filling heads. Wash the bottle by bottle conveyor drive mechanism, push the bottle landed filling shelves, push the bottle cylinder filling operation, the empty bottle onto the filling position, a filling pump and filling solenoid valve action, start irrigation loaded, push the bottle while filling the cylinder is reset. Filling time by the user to adjust as needed.
6, the cap and capping
QGF-450 barrels / H large bucket of water filling production line | bottled water filling equipment when the end of filling a bottle filling the lower cylinder action will push the bottle has been filled bottles to the cap-body jacket cover, cover good cover to capping mechanism bottles, capping the cap pressing cylinder. Thus, a jacket cover gland cycle.
7, product delivery QGF-450 barrel / large bucket of water filling production line | Bottled water bottle filling equipment push cylinder filling action is completed, the finished product conveyor has been running, push the bottle filling cylinder every time the action is completed, the finished bottle pushing cylinder once the corresponding action, the pressure is good cover to the finished product water push conveyor, while indecent bright light, infrared lamp heat-shrinkable film to work on bottle shrink packaging film, shrink by a good bottle conveyor drive transported to the finished position.
Next: ZhangJiaGang XinMeiYuan Machinery Co.,Ltd
快3在线投注 快乐飞艇免费计划 快乐赛车微信群 快乐飞艇计划软件 快乐飞艇怎么样买稳赢 快乐飞艇怎么样买稳赢 河北11选5 快乐飞艇计划8码 快乐飞艇微信群 吉林快3